Where Brickell's Finest Homes Are Transformed.
Remodelling distinguished homes into refined masterpieces, with execution that speaks for itself in Brickell.

-transcode.mp4%20(1).avif)
%201.avif)
Precision
Measured. Verified. Documented.
%201%20(1).avif)
Accountability
One point. Clear answers.
%201%20(2).avif)
Structure
Phased. Sequenced. Controlled.
%201%20(3).avif)
Delivery
On schedule. No drift.
.avif)
We Remodel Private Residences in Brickell While Protecting Everything That Already Works.
MT Construction Group manages high-specification residential remodels from initial assessment through final walkthrough. Every trade is sequenced to protect the existing structure, every material decision is locked before work begins, and no phase opens without a closed prior one.
A controlled process that protects the residence while enriching it.

We conduct a full site assessment, document existing conditions, and lock the remodel scope before any demolition begins. No assumptions. No surprises mid-project.

Trades are scheduled to minimize disruption to occupied or adjacent areas. Structural, MEP, and finish work proceeds in order — each phase closed and inspected before the next opens.

Every surface, system, and finish is reviewed against the original specification. Handoff includes full documentation, updated as-built drawings, and material warranties.

TESTIMONIALS
What Our Clients Say
95
%

600
+
Six Reasons Why Owners Trust MT Construction With Their Residence In Brickell.
Scope Discipline
Every remodel is defined in full before a single trade enters the property, no open-ended contracts.
Site Protection
Existing finishes, systems, and structures are documented and protected throughout every phase of work.
Trade Sequencing
Demolition, structural, MEP, and finish trades are scheduled in order, no overlap, no rework.
Material Control
All specified materials are sourced and verified before installation, no substitutions without written approval.
Single Accountability
One dedicated project manager oversees the full remodel from first assessment to final sign-off.
Fully Compliant
All remodel work is permitted and inspected in compliance with Miami-Dade and Florida Building Code requirements.
Get in touch
Frequently Asked Questions
.png)
Our remodel scope is defined project by project and can cover structural modifications, MEP upgrades, interior reconfiguration, finish replacement, and system integration. Every scope is documented in full before work begins. We do not operate on allowances or open-ended budgets, all material and labor decisions are fixed prior to mobilization.
.png)
Prior to any demolition or construction activity, we conduct a full site documentation of existing conditions. Protection protocols are assigned to each trade and enforced throughout the project. Any area outside the defined scope is formally excluded from the work zone and remains undisturbed.
.png)
Yes. We manage the full permit process for all applicable remodel work, including structural modifications, MEP changes, and any alterations requiring county or municipal review. Permit scope and timelines are established during pre-construction and factored into the project schedule.
.png)
Timeline depends on the scope, the condition of the existing structure, and the complexity of finish specifications. Most high-specification residential remodels in the Miami-Dade area range from 3 to 12 months. We establish a phased project schedule during pre-construction and manage to it through milestone-based delivery.
.png)
Occupancy during construction depends on the scope and the areas affected. We assess this during pre-construction and structure the sequencing accordingly. Where partial occupancy is possible, trade schedules are organized to isolate active work zones from occupied areas at all times.
.png)
Unforeseen conditions are documented immediately, presented to the client with options, and resolved through a formal change order before any additional work proceeds. We do not continue past a discovered condition without written authorization. This keeps both the scope and the budget in your control.
.png)
Material specifications are established during pre-construction in alignment with the design intent and the existing residence. All selections are documented and client-approved before procurement. No material is substituted on site, any deviation from the approved specification requires written sign-off.
.png)
Yes. We work within the requirements of condominium associations, building management protocols, and HOA construction guidelines. Pre-construction coordination includes review of building rules, approved working hours, freight and access logistics, and any association-mandated insurance or licensing requirements.


%201.avif)
.avif)


.avif)
%201%20(3).avif)

.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)

.png)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.avif)
.png)
.png)
.png)



.avif)
.avif)
.avif)